MIL-F-80069D
6.7 Safety and health requirements. The 29 CFR 1910 limits only the total
hazard 1evel (noise, radiation, electromagnetic emissions, noxious vapors, air
contaminants and heat) of the environment-in which a machine will operate. It
does not limit the hazard level of individual machines in an operating
environment. The procuring activity should analyze the existing hazard level
in the proposed operating environment and specify additional requirements
necessary to integrate this new machine into its future environment.
6.8 Training. Training required by
the procuring activity should be pro-
vided as specified in the contract.
Warranty requirements should be as specified by the procur-
6.9 Warrant
ing activity in the contract.
6.10 Inspection location. The contractor shall identify in his response to
the solicitation he location where inspection and tests are to be performed.
6.11 Part or Identifying Number (PIN). The PIN to be used for machines
acquired by this specification are created as follows:
6.12 Subject term (keyword) listing.
Beading
End Preparation
Flanging
Flaring
Tubing
Custodians:
Preparing activity:
Army - AL
DLA - IP
Navy - SH
Air Force - 99
Project (3441-0126)
Review activities:
Air Force - 84
User activities:
Navy - MC, YD
17
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business